adit

adit

1. The development systems are the adit and pass above 4100m level, and underground shaft under 4100m.

4100m以上选用平硐溜井开拓系统,4100m以下选用盲竖井开拓系统。

2. Adit Testdesk at training, psychological testing, skills testing, corporate training plan, market surveys and other similar areas of very effective.

Adit Testdesk 在培训,心理测试,技能测试,公司培训计划,市场调查以及其它类似的领域非常有效。

3. Adit Testdesk ownership for organizations of any functional test.

Adit Testdesk 拥有用于组织测试的任何功能。

4. APPLICATION OF MAPGIS COMPONENTS IN THE SPATIAL DATA MANAGEMENT OF ADIT

MAPGIS组件技术在平硐空间数据管理中的应用

5. TBM roadway ripping machine used in adit construction

TBM岩巷掘进机在平峒施工中的运用

6. CHEN Zhong.Introduction of intersection design of adit and highway tunnel[J].Journal of Science &Technology Communication,2000,(1):1-4.

[2]陈中.公路隧道行车横洞与正洞交叉连接部的设计简介[J].科学技术通讯,2000,(1):1-4.

7. ZHANG Min-qing,HAN Zhan-bo.Construction technology of cavity section in parallel adit at intake portal of Yuanliangshan tunnel[J].Tunnel Construction,2002,22(3):7-14.

[3]张民庆,韩占波.圆梁山进口端隧道平导过溶洞段施工技术[J].隧道建设,2002,22(3):7-14.

8. adit level

[机] 横洞, 横井, 横坑

9. adit air

[机] 空气入口

10. the permanent shiplock construction in the first stage includes its excavation in the first stage,drainage works of the high slope in the first stage,construction adit of the water conveyance system.

一期工程包括一期开挖、高边坡山体排水一期工程和输水系统施工支洞三大标块。

11. Cause on Concrete Crack in Pressure Adit of The First - stage Pumping Station, The South Main Line of YRDP

万家寨引黄南干一级泵站压力平洞混凝土裂缝成因分析

12. RHEOLOGICAL TEST RIG FOR TRIAXI- AK STRESS ADIT

三轴岩峒流变试验台

13. hanging adit

上盘平硐

14. a tunnel horizontal to the surface leading to a mine is called an adit.

与地表平行通向井下的坑道是平峒。

15. MODEL OF A COMPLETE SET OF MACHINERY DURING RAPID CONSTRUCTION OF PARALLEL GUIDING ADIT AT EAST QINLING TUNNEL

东秦岭隧道平导快速施工机械设备配套模式

16. Through research, the designed scheme of upward excavation and concrete placement in adit was changed to downward excavation and stratified concrete placement for structural blocks of wide shaft well, fullfiling the design requirement.

为此,经研究将原设计的由下向上平洞开挖浇筑混凝土方案改为以宽竖井为结构分块单元的由上向下开挖和由下向上分层浇筑混凝土的施工方案,达到了设计效果。

17. Main transport adit

主运输平硐

18. deep adit

低层平硐

19. Adit Testdesk the use of the test design has been tested to show the level of knowledge or what can be done.

使用 Adit Testdesk 的测试设计可以显示被测试者的知识水平或者可以做哪些事情。

20. intake adit

供风通道 供风口

21. Study on tunnel construction mechanics at intersection of horizontal adit and major tunnel in highway

公路长隧道与横通道空间斜交结构施工力学研究

22. This paper introduces the method for directive generation of adit graphic files with the information from multiple sources acquired during tunnel construction using MAPGIS component technology.

利用MAPGIS组件技术,实现了将隧道施工中采集的多源种类数据信息直接生成MAPGIS支持的平硐图形文件,并且能将平硐的图形信息和隧道采集数据进行连接与同时管理的功能。

23. Building served by a ground-source heat pump system with adit water source

利用坑道水的地源热泵工程

24. prospecting adit

勘探平硐

25. exploration adit

勘探洞 勘探平硐

26. The cross section of Beijing Yingshan Mountain tunnel is superlarge scale supershallow overburden,by using of positive step are guiding adit excavation on method are both satisfactory in effect and cost.

北京鹰山隧道断面特大,埋深特浅,采用正台阶弧形导坑施工法开挖,效率及成本均优。

27. A Feasibility Study on Prolonging the Service Life of the 290 Level Adit in Nanfen Surface Mine

南芬露天矿延长290平硐服务年限的可行性研究

28. Tashan mine are excavated in a main and a auxilary adit.

同煤集团塔山矿采用主、副平硐开拓方式。

29. High-speed Construction Methods of Driving Main Adit with A Speed of 322.6 m in a Month in Sichuan Huaying Longtan Coal Mine

四川华蓥龙滩煤矿主平硐月进322.6m的快速施工方法

30. Rapid excavation of parallel adit in Yuanliangshan tunnel

圆梁山隧道平行导坑快速施工技术

31. During the next few weeks,an adit of your organization will be scheduled and performed to verify implementation of your quality management system and any applicable exclusions.

在接下来的几周内,我们会安排和执行一个对于贵公司的审核,用于核实贵公司的质量管理系统的运行情况和任何试适用的修改。

32. underground adit

地下信道

33. PD29 exploration adit and the spring water nearby. Blowing spots of groundwater are controlled by T 2-3Z 2(4) rock layer and NW-striking fissures.

地下水涌水点的分布受 T2 - 3z2 ( 4 )层和 NW向张性裂隙带控制。

34. geological adit exploration

地质硐探

35. Underground Excavation Conversion Technology for Entering Main Construction through Subway Large Adit

地铁特大风道进主体暗挖施工转换技术

36. ventilastion adit

地铁风道

37. adit prospecting engineering survey

坑探工程测量

38. adit entrance

坑道入口

39. Adit planimetric

坑道平面图

40. adit survey

坑道测量

41. Supervision on Construction of Experimental Curtain Grouting in Adit of Dongping Arch dam Abutment

坝肩?406平洞帷幕灌浆试验施工监理

42. Based on the geology statistical data in the field,the variance of permeability of the corroded rock mass in the grouting adit of Qingjiang Shuibuya project in a typical karst region in south China is computed.

基于现场灌浆平硐揭露的工程地质统计资料,对清江水布垭工程左岸帷幕线上部分段进行了渗透性变异的量化研究。

43. The Construction of a Super Room for TBM Break-down in Tashan Main Adit

塔山主平硐特大型拆机硐室施工

44. Reasonable layout of adit in tunnel for water conveyance project of Dahuofang Reservoir

大伙房水库输水工程支洞的合理布局及设计

45. these had a gene adit(added) to interfere with the biological causes of leaf loss during drought.

它们被添加了在干旱条件下能干扰引起叶子损失的生物因素的基因.

46. Coal and Gas Burst Monitoring at No. 18 Coal Layer in Parallel Adit of Jiazuqing Tunnel

家竹箐隧道进口平导18~#煤层的防突检验

47. The algorithms of clipping, intersection and translation are also given when the dault demarcation line crosses the path of a borehole or an adit.

对于地质剖面图中断层分界线遇到钻孔或平洞的情况,文中建立了它们的求交、平移和裁剪算法。

48. IMPROVEMENT OF EXPLOITATION METHOD AND ADIT ENTRANCE TRANSPORTATION OF CHANGPO MINE

对长坡矿坑口运输及开采方法的改进

49. EXPLORATION ON OPTIMIZATION OF ADIT SCHEME FOR SIZEHE TUNNEL AND ITS CO NSTRUCTION SITUATION

寺则河隧道辅助坑道方案优化及施工情况探讨

50. Quality Test and Defect Treatment of Concrete at Pressurized Outlet Adit and Shaft of Pumping Station,The YRDP

山西省万家寨引黄工程地面泵站出水压力平洞、竖井混凝土质量检测及缺陷处理

51. Drill Core and Adit Engineering Geological Study

岩心与坑道的工程地质研究

52. Keywords Ekou iron mine technical reform equip-ment reform adit &draw raise shaft furnace &pelletiz-inq design rectiflcation;

峨口铁矿;技术改造;设备更新改造;平峒溜井;竖炉球团;修改设计;

53. Keywords engineering geology;deep shaft;adit digging;

工程地质;深井;硐室开挖;

54. The application of engineering geology to specific adit digging at deep shaft

工程地质在深井中特殊硐室开挖中的应用

55. access adit

巷道口

56. ADIT SURROUNDING ROCK NONLINEAR DESTRUCTION REASONS AND CONTROLLING WAYS

巷道围岩非线性变形破坏机理及其控制方法

57. parallel adit

平导

58. adit | tunnel | gallery

平峒| 横坑道

59. adit opening

平洞口 坑道口

60. adit collar

平硐口

61. Adit Sonic Wave Hole Seepage Test to Determine Rock Permeablity Coefficient

平硐声波孔渗水试验确定岩体渗透系数

62. extending in adit development

平硐开拓延伸

63. adit cut mining

平硐开采

64. adit mine

平硐开采矿山

65. Application and Improvement of Adit - Pass Development Mode

平硐溜井开拓方式的应用及改进

66. It was considered to be feasible applying natural draft ventilation in small mine applying adit devebopment in mountainous region , in particular environment .

并认为,山区平硐开拓的小矿山,在一定条件下,采用自然通风是可行的。

67. When we reached half way down the adit, most of the teammates go back to the ground to collect stibnite from the spoil heap, however 5 of us go straight down to the bottom of the adit.

当进到洞口约一半路程,很多队员已经打退堂鼓,纷纷回到地面探集辉锑矿石。

68. We have an exciting activity in the first day, because the mine owner allow us to enter the adit.

想不到第一天便有惊喜节目,因为矿主特别准许我们下矿洞参观。

69. shear resistant adit ( G2 )

抗剪传力硐

70. drain adit

排水平峒

71. water adit

排水平巷

72. The seepage cause in the adit and shaft of the third-stage pumping station of the general main line in YRDP is analyzed.

文中针对万家寨引黄工程输水隧洞及泵站平洞竖井存在的渗漏原因进行分析研究。

73. sloping adit

斜坑道

74. inclined adit

斜硐

75. construction adit

施工坑道

76. daily operation adit to ensure effective implementation on the icp and risk areas to be controlled.

日常审计、确保所有内部控制制度有效的履行,以及公司运作风险得到有效控制;

77. Keywords Mine flood in heavy raining;Lindai aluminium Mine;Adit;Karst;Out seam raise;

暴雨淹井;林歹铝矿;平峒;溶洞;脉外天井;

78. It shows that impervious curtain and drainage adit are very useful in reducing the saturation area of abutment and the elevation of saturation line;

本文研究成果表明:防渗帷幕和排水平硐对于减少坝肩(基)浸润区范围,降低浸润线高程效果显著,可以有效改善拱坝坝肩(基)及下游边坡的整体稳定性。

79. Keywords structural characteristics;mine allocation of production;mining method;geological adit exploration;Wuci coalmine;

构造特征;矿井生产布局;采煤方法;地质硐探;吾祠煤矿;

80. Investigation and assessment of overbreak in the adit PD_6 of a pump-storage hydroplant

某抽水蓄能电站PD_6平洞超挖调查与评价

英语宝典
考试词汇表