damsite
1. (Yuan Dengwei,Mei Yingtang,Qin Xingli,et al.Study on the Crust Stability in Damsite and Surrounding Area of the Three Gorges Project[M].
[12] 袁登维,梅应堂,秦兴黎,等. 长江三峡工程坝区及外围地壳稳定性研究[M]. 武汉:中国地质大学出版社,1996.
2. ZHOU Wei-yuan, YAN Gong-rui, YANG Ruo-qiong.Elasto-brittle damage model for rockmass based on field tests in laxiwa arch damsite[J].Chinese Journal of Geotechnical Engineering, 1998,20(5): 54-57.
[4]周维垣,剡公瑞,杨若琼.岩体弹脆性损伤本构模型及工程应用[J].岩土工程学报,1998,20(5):54-57.
3. TGP damsite has an excellent engineering geology condition.
三峡坝址工程地质条件优越。
4. natural high slopes on damsite riversides
两岸天然高边坡
5. Disputes and Argumentations on Natural Flood Flow at Damsite during Construction Period at Ertan Hydropower Station
二滩水电站施工期坝址天然洪水的争议及论证
6. In the damsite of Wuqiangxi Hydropower Station, there is a high side-slope in left bank.
五强溪水电站坝址左岸边坡高,自然边坡上缓下陡,边坡岩体岩性软硬相间,节理裂隙密集。
7. Damsite stage - discharge relation affected by backwater
受顶托影响的坝址水位流量关系
8. Engineering Geology Proof for Choosing Damsite of A Hydropower Station in Baoxing, Sichuan Province
四川宝兴某水电站厂址选择的工程地质论证
9. RESEARCH ON THE DEFORMATION MECHANISM AND TREATMENT MEASURE OF THE LEFT ABUTMENT SLOPE AT A DAMSITE IN SICHUAN
四川某水库大坝左坝肩边坡变形破坏机制及整治对策探讨
10. damsite granite
坝区花岗岩
11. Evaluation of Geological Conditions in Comparative Choice of the Damsite
坝址比较选择中地质条件的评价
12. damsite selection
坝址比选
13. It sums up the simplified arrangement of power tunnels and underground powerhouses at the damsite and pumped storage power stations.
对坝区电站和抽水蓄能电站地下厂房输水系统的简化布置进行了归纳,探讨优选其布置的途径,供有关人员参考、讨论。
14. It is not allowed that the waste water and other harmful liquid from debris leak out throughreservoir and damsite because it will pollute environment seriously.
尾矿废水和废渣通过库、坝址向库外的泄漏,是不允许的,将会对环境造成极大的危害。
15. Hydraulics method for developing stage- discharge relation at a damsite
拟定坝址水位流量关系的水力学方法
16. The control of Dayantan landslide near the damsite of Shuibuya project on Qingjiang river was one of the important engineering problems on the hydropower project construction.
摘要清江水布垭坝址附近大岩淌滑坡处理是枢纽建设的重大工程问题之一。
17. Hydrogeologic Condition Analysis of Inclined Hole Crossing River in a Damsite Area
某水电站坝区过河斜洞的水文地质条件分析
18. Discussion on Hydrogeologic Condition in Damsite Area at Xiaojinggou Reservoir
浅谈小井沟水库坝址区水文地质条件
19. Regularity of fractures growth on the basalt around the damsite of Xiluodu Hydroelectrical Station and its permeability analysis
溪洛渡水电站坝区玄武岩裂隙发育规律及渗透性分析
20. Analysis of annual sediment discharge through TGP damsite by means of random model
用随机模型分析三峡年输沙量
21. The toppling deformation body is near to the damsite and shows higher terrain.Once the toppling deformation failures happen the loss will be disastrous for the construction of the Hydropower Station.
由于倾倒变形体紧邻大坝且地势较高,一旦失稳,将给小湾水电站的建设造成不可估量的损失。
22. The good results of application of the technology were got in geological survey for determining the damsite of Guxian Hydro-junction over the Yellow River.
经在黄河古贤水利枢纽坝址勘探中应用,取得了较好效果。
23. Characteristics and comprehensive treatment of natural high slopes on damsite of Laxiwa Hydropower Project, the Yellow River
黄河拉西瓦水电站坝区天然高边坡特征及其治理
24. STUDY OF FRACTURE STRUCTURE FRAMEWORK AND ENGINEERING ANTI-FRACTURING IN DALIUSHU DAMSITE DISTRICT, HEISHANXIA GORGE
黑山峡大柳树坝址区断裂构造格局与工程抗断问题研究
25. :earth and rock dam, damsite selection ,choice of dam type, soil design, filtration routing,stability analysis,discharge construction,construction planning.
:土石坝设计,洪水演算,枢纽布置,土料设计,渗流计算,稳定验算,泄水建筑物,施工组织设计。