1. The building inspect of a R-300 dual purpose workboat

R300两用工程船舶的建造监理

2. It introduces the method, content and result of cross- sectionalmodel test of light hollow block structure adopted for workboat wharf, which provides reference for design.

介绍工作船码头采用轻型空心方块结构型式的断面模型试验方法、测试内容及试验结果,为设计提供依据。

3. Taking the workboat wharf berthing members in a wharf extension project as an example, it introduces the application and structural characteristics of shape steel concrete structure in wharf berthing member design.

以扩建工程中工作船码头靠船构件为例,介绍型钢混凝土结构在码头靠船构件设计中的应用及结构特点。

4. Accelerating the depreciation of workboat ship and promoting the competitive power

加速工程船舶折旧提升竞争能力

5. Moreover, the Guangdong Marine board's data demonstrated that is had 2474 the typhoon influence in the port ships, passenger steamer 430, dangerous material ship 314, workboat 283, nonmotile ships 89.

另外,广东海事局的数据显示,受台风影响的在港船舶有2474艘,其中客船430艘、危险品船314艘、施工船283艘,无动力船舶89艘。

6. workboat terminal

工作船码头

7. Afloat condition adjustment of workboat

工程作业船舶的浮态调整

8. Analysis of the application of intactness rate and operability rate for workboat

工程船舶完好率和可运转率的运用分析

9. A brief analysis on the design of workboat for towing and ice-breaking

拖带破冰工作船设计浅析

10. Design of underwater pump davit for deep water dredging workboat

深水疏浚工程船水下泵吊放装置开发设计

11. Due to special features of workboat, their afloat condition adjustment is very important.

由于工程船的一些特殊特点,船舶的浮态调整非常重要。

12. dredging andhollow block hoisting construction for the workboat wharf project, rational construction scheme was adopted, which ensured successful completion of the project on schedule.

针对工作船码头工程基槽挖泥和吊装空心方块施工中所存在的问题,采用了较合理的实施方案,保证本工程按时顺利完工。